PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Interior metal framing at the 2nd floor Facing West.jpg Runing split wire above the ceiling at the 1st floor Facing North.jpg Sprinkler branches at the 1st floor Facing North.jpg Fixed Low Roof Curbs Facing East (2).jpg Fixed low roof curbs Facing East.jpg Installing ductwork at the 4th floor Facing West.jpg Layout 2 courses of block around the perimeter of the 2nd floor roof Facing South.jpg Low roof storm piping at the 4th floor Facing West.jpg Started the 3rd floor interior metal framing Facing West.jpg
Previous pageNext page Fixed low roof curbs Facing East
Fixed low roof curbs Facing East